There is a scheduled concrete placement for the Storm Nasatir project tomorrow, Oct. 4, beginning 6 a.m.  There will be concrete trucks coming through Scripps Terrace during the morning hours, entering through the construction fenced area at north end of Nasatir 100 building.  There will also be concrete trucks parked along the lower slope of Aztec Circle Drive for buildings D&E footing placement.  In an effort to minimize pedestrian traffic blockage we have requested the contractor to not park the concrete trucks in waiting mode along Scripps Terrace.

Leave a comment

Filed under Uncategorized

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s